Sheet Metal RFQ and First-Article Review Record
Keep the specification, open question, evidence and approval decision connected as your project moves to the next stage.
Download and use the record
Download the blank CSV worksheet
Open it in a spreadsheet editor. Add one row per check, identify the responsible person and link the actual file, sample or observation. Keep unresolved rows open instead of treating a submitted form as an approval.
What the worksheet covers
- Part number and drawing revision
- Material grade and thickness
- Bend radius and reference datums
- Critical hole/bend relationships
- Hardware insertion specification
- Weld sequence and cosmetic zones
- Finish and masking requirements
- Prototype and production quantities
- Inspection method and fixture
- First-article findings
- Accepted deviation / owner
- Release revision and packing notes
How to make an approval reviewable
- Identify the product, file revision and physical sample before recording a finding.
- State the expected condition and how it will be checked.
- Attach the actual evidence and name the person responsible for the disposition.
- Record approve, revise or hold together with the next revision and date.
This is a blank planning tool. It is not an inspection report, certification or evidence of completed work. Acceptance limits and responsibilities must be agreed for your project.