
Prepare these details.
Weld type or load directionAssembly fixtures or critical datumsGrinding and cosmetic expectationsPacking and shipping constraints
How we review the request
The first response should clarify whether the submitted file is enough for quote, which assumptions affect price or lead time, and what DFM issues should be resolved before production starts.
| Assembly input | Why it affects quote |
|---|---|
| Weld length and position | Changes labor, fixture and distortion risk. |
| Critical dimensions | Defines inspection points and fixture needs. |
| Finish after welding | Affects grinding, coating and masking route. |